The quality part of the Common Technical Document, defined in ICH M4Q, has barely changed since M4Q(R1) was finalised in 2002. Its revision, M4Q(R2), reached Step 2 in May 2025 and went out for consultation in the ICH regions; the final guideline (Step 4) is planned for 2027, after which each region will set its own implementation date. The draft changes both the role of the summary and the organisation of the data.
The core idea
In M4Q(R1), Module 3 holds the information and Module 2.3, the Quality Overall Summary, repeats it in shorter form, section by section. In the M4Q(R2) draft the relationship is reversed: Module 2.3 becomes the place where the key quality information, the control strategy and its justification are presented and assessed, and Module 3 holds the supporting data.
M4Q(R1): Module 2.3, Quality Overall Summary
- 2.3.S Drug substance (S.1–S.7)
- 2.3.P Drug product (P.1–P.8)
- 2.3.A Appendices
- 2.3.R Regional information
M4Q(R2) draft: Module 2.3
- 2.3.1 General information
- 2.3.2 Overall development and overall control strategy
- 2.3.3 Core quality information
- 2.3.4 Development summary and justifications
- 2.3.5 Product lifecycle management
- 2.3.6 Product quality benefit-risk (optional)
Module 3: from a fixed list to a modular structure
M4Q(R1) uses one fixed list of headings for the drug substance (3.2.S.1–S.7) and one for the drug product (3.2.P.1–P.8), with appendices for facilities, adventitious agents and novel excipients. Products that do not fit, such as drug-device combinations or multiple intermediates, are placed wherever they fit best. The draft R2 gives every material its own place and the same order inside it.
M4Q(R1): Module 3.2
- 3.2.S Drug substance: general information, manufacture, characterisation, control, reference standards, container closure, stability
- 3.2.P Drug product: description, pharmaceutical development, manufacture, excipients, control, reference standards, container closure, stability
- 3.2.A Appendices
- 3.2.R Regional information
M4Q(R2) draft: Module 3
- One block per material: drug substance, intermediates, excipients, drug product, device constituents
- The same order in every block: description → manufacture → control → storage
- Development data and justifications linked to the summary in 2.3.4
- Regional information in an addendum
Side by side
| M4Q(R1) (2002) | M4Q(R2) draft (2025) | |
|---|---|---|
| Role of Module 2.3 | Summary of Module 3, about 40 pages | Main presentation of the quality case; basis of the assessment |
| Control strategy | Spread across S.2, S.4, P.2, P.3 and P.5 | Presented as a whole in 2.3.2 |
| Development knowledge | Mainly P.2 (pharmaceutical development) | Development summary and justifications for substance and product (2.3.4) |
| Lifecycle | Not addressed in the structure | Own section (2.3.5) using ICH Q12 tools such as established conditions and post-approval change management protocols |
| Benefit-risk | No place for it | Optional product quality benefit-risk section (2.3.6) |
| Module 3 organisation | Two fixed lists (S and P) plus appendices | One block per material with a repeated order |
| Complex products | Fitted into existing headings | Intermediates, excipients and device constituents have their own place |
| Regional information | 3.2.R | Addendum |
| Link to other ICH guidelines | Written before ICH Q8–Q12 | Built on ICH Q8–Q12 concepts |
What this means for sponsors and manufacturers
- Module 2.3 can no longer be written at the end. The control strategy and its justification have to be clear during development, because they will be presented as the core of the dossier.
- Development knowledge becomes submission content. Risk assessments, design space and the reasoning behind specifications should be kept in a form that can go into 2.3.2 and 2.3.4.
- Lifecycle is planned at filing. Deciding which elements are established conditions, and how they may change, becomes part of the first submission.
- Existing dossiers are not converted yet. Regions have not published implementation rules; plan new applications first and follow the Step 4 text, as details may still change from the draft.
Hanpars prepares and reviews CTD quality dossiers and helps teams plan the move to the new structure. See CTD/eCTD dossiers and IMPD.